A Performance Solution is an alternative way of complying with the Building Code of Australia (NCC).
The NCC is a performance based code. One demonstrates compliance with the performance requirements by either complying with the prescriptive (deemed to satisfy) provisions of the Building Code, or by the preparation of a performance solution. The Performance Solution may differ in whole or in part from the Deemed-to-Satisfy Provisions, but will still meet the Performance Requirements as long as it can be successfully demonstrated how this will be achieved.
Looking for alternative ways to comply with the Building Code of Australia?
BCA Performance Solutions has you covered with our expert advice and solutions.
Visit BCA Performance Solutions for a quote
BCA Performance Solutions is our new division that can assist in:
- Preparing a Performance Solution for most Performance Requirements
- Preparing a Performance Solution Design Brief
- Certifying compliance with a Performance Solution that someone else has prepared
What is our process?
- Provide us with a detailed scope and upload documents in the form below
- We will provide you with a fee proposal for the relevant performance requirement.
- We will then prepare the performance solution design brief and report for acceptance by the Relevant Building Surveyor and issue it to you in draft form.
- Upon acceptance of the performance solution, we will issue you the final report.
A Performance Solution is an alternative way of complying with the Building Code of Australia (NCC).
The NCC is a performance based code. One demonstrates compliance with the performance requirements by either complying with the prescriptive (deemed to satisfy) provisions of the Building Code, or by the preparation of a performance solution. The Performance Solution may differ in whole or in part from the Deemed-to-Satisfy Provisions, but will still meet the Performance Requirements as long as it can be successfully demonstrated how this will be achieved.
We can:
- Prepare a Performance Solution for most performance requirements in the BCA.
- Prepare a Performance Solution Design Brief
- Certify compliance with a performance solution that someone else has prepared.
We cannot issue a performance solution for a project where we are the appointed Relevant Building Surveyor.
What is our process?
- Provide us with a detailed scope and upload documents in the form below
- We will provide you with a fee proposal for the relevant performance requirement.
- We will then prepare the performance solution design brief and report for acceptance by the Relevant Building Surveyor and issue it to you in draft form.
- Upon acceptance of the performance solution, we will issue you the final report.